*A lift pump station located at low points in agravity-flow sewer system near sea shore which required afull scale of dewatering system and using submerging drilling system.
Role: EDC design and built Of the civil works for the receiving well, pump well ,gas tank, electrical room and administration building including design of sub-surface drainage system,managed the full process of Coordination documents between all trades Of contractors.