*A power plant of 4800 m.watt supporting the Foundation of st.turbins of height exceeds 25m.and Total length exceeds 4 km.
Role: EDC reviewed the design and shop drawings Of the entire wall including design of sub-surface drainage system,managed the full process of Coordination documents between all trades Of contractors,provided the contractors and Subcontractors and supervised The construction Of the Whole wall.